Why Aluwood will significantly reduce your installation timescale

Our most recent project announcement is an exciting one, showcasing 80m² Office Space Transformed in just 24 Hours!

In a fast-paced commercial project located in Harefield, UB9, Deep Contractors carried out the install of 80m² of our premium M03 Walnut floorboards. The installation was completed in a record time of 8 hours, thanks to the integrated insulation and the floorboards simple design mechanism. The project required a high-quality, durable flooring solution that would elevate the aesthetic of the commercial space while adhering to a tight deadline.

Installation Process:

  1. Site Preparation:
    Deep Contractors ensured the subfloor was thoroughly prepared by making sure it was clean, level, and dry. This was crucial for the longevity of the floorboards and a smooth installation process.
  2. Pre-Insulated Floorboards:
    The pre-insulated feature not only provided additional soundproofing and thermal benefits but also meant a simple one sheet 2mm foam underlay could be laid down speedily, drastically cutting down the overall installation time.
  3. Fitting & Precision:
    Using a table saw, skill saw and hand router trimmer, Deep Contractors were able to ensure the floorboards were fitted seamlessly. Special care was taken around edges and high-traffic areas to ensure the floor would withstand long-term use without any issues.
  4. Completion & Finishing Touches:
    Despite the tight deadline, Deep Contractors completed the installation in a speedy 12 hours, with the entire project seeing completion within 24 hours. After installation, the floorboards were inspected for any imperfections, and final adjustments to the beading were made to ensure a flawless finish.

Challenges:
Tight Timeframe: Completing an 80 square meter project in 24 hours was a challenge. However, the versatility, ease of install and pre-insulated properties made it possible to meet this deadline without compromising on quality.
High-Traffic Areas: Extra attention was given to the entryways and high-traffic zone to ensure the boards were installed securely.

Outcome:
The project was successfully completed within the 24-hour timeframe, and the result was a stunning, durable walnut floor that enhanced the aesthetic appeal of the commercial space. The pre-insulated floorboards not only saved installation time but also provided added insulation benefits, making the space more efficient and reducing noise transmission.

Client Feedback:
“Our team at Deep Contractors have relayed how time efficient and simple the installation process was, which in the construction industry is a huge bonus all round. Seeing the project complete within 24 hours was outstanding and we’re so excited to watch our partnership with Aluwood Floorboards evolve, with such a fantastic product to hand”